Silchar elevated corridor plan revised; two flyovers, 2.5-km four-lane road proposed at Rs700 crore

2 - minutes read |

New proposal replaces the earlier ?580-crore plan for a continuous elevated road; PWD to place revised design before Chief Minister Himanta Biswa Sarma for approval

KRC TIMES Barak Valley Bureau

Silchar : The proposed elevated corridor in Silchar is set for a major redesign, with the state government considering a revised infrastructure plan involving two separate flyovers and a 2.5-km four-lane road at an estimated cost of ?700 crore.

The revised proposal, discussed at a meeting at the Cachar District Commissioner’s office on Friday, seeks to address concerns raised by different stakeholders over the utility and effectiveness of the earlier plan for a continuous elevated road between Capital Point and Rangirkhari.

Cabinet Minister Kaushik Rai, who also heads the Housing and Urban Affairs Department, said the new design envisages widening the stretch from Capital Point to Gopinath Cinema Hall into a four-lane road of approximately 2.5 km.

Know More https://bit.ly/KRCBrainVision Apply Here https://bit.ly/KRCBVForm
Promotional | For admission to the Brain Vision Program | Know More | Apply Here

The plan also includes a 542-metre flyover connecting Krishnacharan Pathshala with Gopinath Cinema Hall and another 500-metre flyover between Sadarghat and the Radio Station.

The connecting road will have a central divider, improved drainage, footpaths and dedicated spaces for utility services, Rai said. The proposed changes are intended to ease Silchar’s persistent traffic congestion and improve the city’s transport infrastructure and urban landscape.

The meeting was attended by elected representatives, senior Public Works Department officials, business associations, social organisations and prominent citizens. Rai said participants, including those who had earlier raised objections to the continuous flyover proposal, had agreed to the revised plan.

The new proposal marks a shift from the earlier design of a 3.5-km elevated road-cum-flyover between Rangirkhari and Capital Point, which was estimated to cost around ?580 crore.

Rai said the PWD Commissioner and Chief Engineer would forward the revised proposal to Chief Minister Himanta Biswa Sarma for consideration and approval. The detailed design will be shared with stakeholders after the government clears the proposal.

The revised plan now places the focus on a combination of flyovers and road widening rather than a single continuous elevated corridor. Its final shape and implementation will depend on the state government’s approval.

Leave a comment

Your email address will not be published. Required fields are marked *

Related news

×

Hello!

Click one of our contacts below to chat on WhatsApp

× How can I help you?